The timing of removing the temporary molds used to cast concrete structures is a critical decision point in construction. Premature removal can lead to structural instability and aesthetic defects, while delaying the process unnecessarily extends construction timelines and ties up valuable resources.
Proper formwork stripping is essential for ensuring the structural integrity of the hardened concrete and optimizing construction efficiency. Historically, rules of thumb were often employed, but modern engineering principles and material science advancements have led to more precise and reliable methods. These advancements improve safety and reduce costs associated with delays or failures.